How to get a scheduled report for particular time period in cloudmon?
To get a scheduled report, you need to follow these steps:
1. Navigate to the reports section in ITIM in your Cloudmon portal.
2. Click on the "add" icon to create a new report.
3. Configure the report by giving it a name and choosing templates for the respective device/IP endpoints.
4. Select the frequency of the report, which can be hourly, weekly, daily, or monthly.
5. Add notifiers to whom the report must be sent.
6. Save the report, and it will be generated and sent out to the designated notifiers at the specified frequency.
Related Articles
Scheduled Reports
Reports Scheduled Reports Schedule pre-defined report templates to generate automatically at a chosen frequency and deliver results by email to selected recipients. No manual action required once configured. Overview Scheduled Reports in Cloudmon ...
Resolving "Agent Heartbeat Failed" Due to Time Synchronization Mismatch
Agent Troubleshooting Resolving "Agent Heartbeat Failed" Due to Time Synchronization Mismatch Diagnose and fix heartbeat failures caused by a system clock mismatch between the Cloudmon Agent and the Cloudmon Controller by verifying and correcting NTP ...
What is the estimated installation time for Cloudmon Controller from start to finish?
Assuming the prerequisites are satisfied and there is a stable internet connection, the installation of Cloudmon usually takes around 3 to 5 minutes.
Why do I observe a spike in my website response time?
Response time is a combination of DNS time, connection time, SSL Handshake time (for HTTPS) and download time. Spikes in response time could be due to increase in DNS time or connection time or download time. Some factors to consider: 1. Server may ...
Scheduled Maintenance
Settings Scheduled Maintenance Schedule maintenance windows so planned downtime on selected monitors does not raise alarms or count against availability. Windows can run once or on a recurring schedule and apply to individual monitors or a monitor ...